Munro College · Plumbing & water managementCompleted
Ground Floor Bathroom, PC Dormitory
A full renovation of the ground-floor bathroom in the PC Dormitory at Munro College: new plumbing and floor drains, new urinals, water-saving toilets and faucets, new tiling and porcelain flooring, a new entrance door, and fresh paint.
- Procurement & construction
- February 2023 to April 2023
- Project managers
- L’Art Interior Design Studio Ltd., Kingston, Jamaica
Scope of work
- Removal of the existing surface mounted plumbing and tiles and installation of new pipes
- Removal of leaking floor drains with new 4” diameter floor drains and the associated plumbing
- Installation 2 new urinals
- Removal of the tiles and replacing with new tiles and plastic corner edge protectors for the washing trough
- Removal of existing 5 faucets and replace with new faucets
- Removal of existing 4 toilets and installation of 4 new water saving toilets
- Removal of cracked mirror with mold/fungus due to water behind, replacing with a new mirror
- Removal of the existing entrance door and installation for a new entrance door and hardware & closer
- Bleach and water washing of the walls, filling of cracks and depressions with cement and painting
- Sponge mop bleach and water the celling, touch up white paint
- Painting of 4 toilet stall doors
- Flooring upgrade to porcelain 24”x24” tiles
- Requires a 4-inch diameter floor drain and the associated plumbing
Before renovation

Old urinal stall with white wall tiles and exposed pipes. Before renovation, February 2023 to April 2023. 
Washroom with stall partitions and a long washing trough before renovation. Before renovation, February 2023 to April 2023. 
Shower area with worn tiles and a floor drain. Before renovation, February 2023 to April 2023. 
Tiled wall with exposed pipe fittings. Before renovation, February 2023 to April 2023. 
Toilet stall with old flooring. Before renovation, February 2023 to April 2023. 
Two old urinals on a white tiled wall. Before renovation, February 2023 to April 2023. 
Old tiled washing trough with faucets. Before renovation, February 2023 to April 2023.
Renovation

Two new urinals on a grey tiled wall. Renovation, February 2023 to April 2023. 
Toilet stall with new porcelain floor tiles. Renovation, February 2023 to April 2023. 
Renovated washroom with a new floor and dark stall partitions. Renovation, February 2023 to April 2023. 
New grey-tiled washing trough. Renovation, February 2023 to April 2023. 
Renovated washroom floor and stalls. Renovation, February 2023 to April 2023. 
New porcelain floor beside the washing trough. Renovation, February 2023 to April 2023. 
Washing trough with new tiles and faucets. Renovation, February 2023 to April 2023. 
New urinals above a tiled step. Renovation, February 2023 to April 2023.
Source: MHIF Project Reports, January 2023 to December 2024.
Project financial report
Request it by sending your name and email address to info@munrohamptonfund.org.
More completed projects

Munro CollegeCompleted
Exterior Solar Area Lighting
Completed October 2024
Procurement and installation of five exterior LED solar area lights on the Munro College campus.
See the photographs for Exterior Solar Area Lighting
Hampton SchoolCompleted
House Mother Office Doors, Window and Awning
Completed October 2024
Custom-built replacement doors and jambs and a new wooden awning for the House Mother office at Hampton School.
See the photographs for House Mother Office Doors, Window and Awning
Hampton SchoolCompleted
Blue Dorm Doors
Completed October 2024
Eight custom-built doors and four new door jambs for the Blue Dorm at Hampton School.
See the photographs for Blue Dorm Doors